Case study · Power line
Dronnit measures a 3.4 km power line in one day of LiDAR flights 23 poles and 154 conductors in 3D
A solar developer asked Dronnit for a video of the medium-voltage line between a substation and its site. Dronnit flew the corridor with LiDAR the same day, and Lidarvisor classified the 120 million points and vectorized the poles and conductors in 46 minutes.
No credit card • 50 hectares free • Nothing to install

- Lidarvisor processing
- 46 min
- Poles positioned
- 23
- Conductors in 3D
- 154
The project
A video was asked for. The line was measured.
The developer needed a full reading of the line, from the substation to the site, and a route it could use in GIS with the position of every pole. The brief only described a video. A video shows a line; it does not measure it.
- Client: a solar developer (name not published, for confidentiality)
- Line: medium voltage, 3,389 m, 23 poles, spans from 77 to 307 m, across crops, hedges and a wooded valley (Vienne and Indre-et-Loire, France)
- Flight: DJI Matrice 350 RTK with a Zenmuse L1 at 50 m, two strips per span, 14 flights and 55 minutes in the air on the same day as the 4K video (DJI Matrice 4T)
- Processing: Lidarvisor, power line options, 41.5 ha and 120 million points in 46 minutes
What was delivered
From the point cloud to a line in GIS
Lidarvisor classification and vectorization
Poles and conductors, extracted
Lidarvisor sorted every point of the cloud, then drew the conductors as 3D lines with their catenary sag (image: conductors in magenta, poles in cyan, everything else in the cloud’s own colors). Dronnit checked every pole found in the cloud against the images before it entered the delivered table.
- Route in KML and KMZ: axis, poles, conductors, neighboring lines
- Conductors in 3D, GeoJSON
- Table of the 23 poles, CSV: coordinates, height, chainage and type

Long profile
Every span, measured
The 23 poles and every span of the 3,389 m were measured from the same cloud: pole heights, chainage and the long profile of ground, vegetation tops and conductors. The span over the wooded valley, where the cloud is interrupted, is flagged as reconstructed.
- 4K video indexed on the measured chainage, and an edited film
- Mission and quality-control report

In the browser
The same project in the Lidarvisor viewer
The cloud as flown, then the classification Lidarvisor produced: ground in blue, vegetation in green, conductors in orange. Nothing to install; Dronnit shares the project with a link.
In numbers
One day of flights, one run
| Measure | Value |
|---|---|
| Line surveyed | 3,389 m |
| Poles positioned | 23 |
| Conductors vectorized in 3D | 154 |
| Spans | 77 to 307 m, median 157 m |
| Strip alignment | 1.7 cm over 31 strip pairs |
| Lidarvisor processing | 41.5 ha, 120 million points, 46 min |
Figures from Dronnit’s mission report and the Lidarvisor project.
About Dronnit
Drone surveys and inspections in France

Dronnit (Topovisor) flies LiDAR, photogrammetry and thermal surveys for developers, engineers and public owners across France. Dronnit is run by Lidarvisor’s founder.
Run one of your corridor flights through it
Upload the LAS or LAZ file of a corridor in the browser and get the poles, the conductors in 3D and the clearance findings back in the same run.
Test it on one of your flightsNo credit card • 50 hectares free