OHM Works’ first power line survey Every span measured from one drone flight
OHM Works, a drone survey company in Benin, had never surveyed a power line. For a West African distribution network operator, it flew 2.4 km of 33 kV line on the outskirts of Cotonou and, from Lidarvisor’s extractions, delivered a measured clearance for every span and a prioritised trimming list, without switching off the network. Lidarvisor processed its 58 million points in 2 h 42 min.
No credit card • 50 hectares free • Nothing to install

- Lidarvisor processing
- 2 h 42 min
- Spans with a proximity issue
- 47 of 55
- Closest vegetation (threshold 2 m)
- 1.00 m
In their words
OHM Works
It was our first power line survey. On a medium-voltage line in a peri-urban area, the question is not how high the line is, it is what grows and gets built around it. With the Lidarvisor extractions, we gave the operator a measured distance, span by span, and a prioritised trimming list, with no power cut and no work at height.
Managing Director, OHM Works
The project
A medium-voltage line through a dense neighbourhood
The operator wanted a complete picture of the corridor to plan its maintenance: an inventory of the supports, the sag and ground clearance of every span, and above all the vegetation and buildings too close to the conductors, so that trimming is planned on measured distances rather than by eye.
- Client: Benin’s electricity distributor, in a demonstration on a real line so it could judge the method
- Line: 33 kV on concrete poles, 57 poles and 56 spans over 2,391 m, on the outskirts of Cotonou
- Constraints: 105 buildings within 3 m of the conductors, fast-growing tropical vegetation, low-voltage and telecom cables under the phases
- Flight: DJI Matrice 350 RTK with a Zenmuse L2, 58.4 million points, network kept live
- Experience: OHM Works’ first power line survey
What was delivered
From the point cloud to a trimming list
Lidarvisor extracted the conductor phases, sampled every 0.5 m, the poles, the buildings in the corridor and the sag of each span. OHM Works built its deliverables on them:
- An atlas of 56 A3 long-profile sheets: an overview of the 2,391 m, a compliance strip, then one dimensioned sheet per span
- A per-span spreadsheet of ground clearance, distances to vegetation, buildings and other cables, and sag, with the trimming priorities ranked
- The cloud, the extractions, the photos and the thermography online in Infradesk, OHM Works’ 3D viewing and asset-monitoring platform
What the analysis showed
The line is high enough. What surrounds it is too close.
| Measure | Result | Threshold |
|---|---|---|
| Minimum ground clearance | 6.78 m (mean 8.50 m) | 6 m |
| Spans with at least one proximity issue | 47 of 55 | — |
| Closest vegetation to a conductor | 1.00 m | 2 m |
| Closest building to a conductor | 1.49 m | 3 m |
| Trees at risk | 24 | — |
Points where the spacing between phases is too small were also found. Figures from OHM Works’ analysis. The Lidarvisor run covered 18.1 ha and 58.4 million points (323 per m²) in 2 h 42 min.
About OHM Works
Drone surveys of energy networks in Benin

OHM Works surveys and inspects energy infrastructure by drone, with LiDAR, visual and thermal sensors, and publishes its results in Infradesk, its own 3D viewing and asset-monitoring platform.
Run one of your corridor flights through it
Upload a LAS or LAZ corridor in the browser and get the conductors, the poles and the clearance findings back, ready for your own deliverables.
Test it on one of your flightsNo credit card • 50 hectares free